4.21 is the company "1221" management inspection is the day, early in the morning, under the leadership of the Executive General Manager Wang Baoteng, we start the reorganization, go to Changxing Seiko factory, Wanda site and Chunfeng site Kaifeng quality and safety inspection.

Processing plants, we checked the Changxing Seiko plant health and component production, welding, paint, operating environment and so on; workshop finishing is very clean, the quality of the components have also been greatly improved than before.


长兴“1221”式管理检查

In Wanda site and Kaifeng Chun Site, we focused on checking the safety of electricity (such as the aging wire, the junction box is normative, is safe ground, etc.), safety helmets, safety ropes and other safety protective equipment wear, the site enclosure , Signs, materials stacked, living facilities and other civilized construction conditions.

长兴“1221”式管理检查

长兴“1221”式管理检查

长兴“1221”式管理检查



No significant safety hazard was found during the inspection. However, on-site education was conducted on some construction sites with no safety signs and non-standard construction enclosure, and ordered rectification within a time limit.


close window】【Print
Friendship link
Copyright ©2017 - 2018 Zhengzhou Changxing Construction Engineering Co., Ltd.
犀牛云提供企业云服务
X
等待加载动态数据...

等待加载动态数据...

等待加载动态数据...

等待加载动态数据...

等待加载动态数据...

等待加载动态数据...

等待加载动态数据...

等待加载动态数据...

等待加载动态数据...

等待加载动态数据...

Back to the top
Open