On December 4, Yao Chaoshe, chairman of the District Political Consultative Conference and his entourage conducted a survey on Changxing Steel.District CPPCC member and general manager Li Zengliang introduced the basic situation of enterprises as well as the difficulties and problems enterprises encountered in the construction of steel structures. Changxing Seiko was founded in 2011 and belongs to Zhengzhou Changxing Construction Engineering Co., Ltd. It is an annual output of 100,000 tons of equipment steel structure processing base and was included into the key support enterprise of Henan Pr...
Release time:
2017
-
08
-
31
Times of browsing:15
Workers are holding team meetings and arranging related workI Changxing Seiko in October to undertake more than 4,000 tons of Dongfeng Nissan project, tight schedule, the task is heavy, the team before class each day to organize pre-class meetings, arrangements for the deployment of all-day work, workers are energetic, each line is full of Semi-finished components; General Manager requires everyone to ensure the construction period, strict quality control, managers on-site daily on-site guidance and inspection, found problems solved in time, all managers and workers are working overtime to com...
Release time:
2017
-
08
-
31
Times of browsing:20
August 26, 2014, in the booming firecrackers, Changxing Seiko South Gate broke ground, since the commencement of the ceremony on October 14, 2011, Changxing self-built 40,000 square meters of factory buildings, beautiful and warm dormitory , Spacious atmosphere of the restaurant, all condensed sweat Changxing people.Follow the work guideline of "consolidating foundation, emphasizing connotation, improving quality, creating characteristic, setting up brand and upgrading level". Chief Engineer Wu Zhin personally designed the style of the south gate and integrated the design of Changxin...
Release time:
2017
-
08
-
31
Times of browsing:18