hotline:0371-63263559
Development of science and technology first
Devotes to air pollution and the development of environmental protection
To air pollution, the development of environmental protection
Recommended products / Products More
Contact us 4008-971-972
The autumn of October is coming to an end. On the site of the Changxing Steel Structure Project, there are still people and cars moving around, and the construction effort is not diminished. As always, it is orderly, as always, the rigorous construction, as always, the busy scene.Tongbai Lanao ProjectAt this stage, the road at the entrance is cut, the pile foundation enters the factory, and the piling operation is ready.Qinqin food projectAt present, the steel frame has been completed and the project progress is 70% completed and will be completed within the plan.
Release time: 2019 - 10 - 31
Times of browsing:15
China Light Steel Construction G30 Symposium and Industry Chain High Quality Department Parts and Technology Seminar was held in Kunshan on October 25th. Mr. Li Zengliang, General Manager of Changxing Steel Structure, was invited to participate in the meeting.At present, China's light steel industry faces standards and standards in design and manufacturing, and it is difficult to form a complete factory. It is urgent for the country to introduce corresponding industry standards. The designer lacks theoretical knowledge in light steel structure, and the designed products often fail to meet ...
Release time: 2019 - 10 - 29
Times of browsing:12
As the state's support for prefabricated buildings increases, new requirements and new requirements, in order to improve the quality of quality services, on October 24, 2019, the company sent people to participate in the PKPM2019 annual user conference to learn new knowledge in the conference.        SATWE is a branch of PKPM. It is a three-dimensional composite structure finite element analysis software based on shell element theory developed for the analysis and design of high-rise buildings. The core is to solve the modeling problem of shear wall and floor slab, redu...
Release time: 2019 - 10 - 25
Times of browsing:109
177页次10/59首页上一页...  567891011121314...下一页尾页
Friendship link
Copyright ©2017 - 2018 Zhengzhou Changxing Construction Engineering Co., Ltd.
犀牛云提供企业云服务
X
等待加载动态数据...

等待加载动态数据...

等待加载动态数据...

等待加载动态数据...

等待加载动态数据...

等待加载动态数据...

等待加载动态数据...

等待加载动态数据...

等待加载动态数据...

等待加载动态数据...

Back to the top
Open